Plan, verify, and keep the evidence current
Certification and inspection readiness determine how quickly your cooking robot moves from installation to approved operation. This checklist helps operators, engineers, facility managers, and inspectors align on documented proof, safe integration, and reliable recordkeeping.
1. Pre-Planning and Documentation
Before purchase or installation, align your documentation and site requirements.
- Identify which authority will inspect your site (AHJ—health, fire, building).
- Confirm adopted code editions and local electrical bylaws.
- Request the technical file, installation manual, wiring diagram, and relevant Declaration of Conformity or NRTL certificate from the vendor.
- Verify model and serial numbers appear consistently on all documents.
- Review space requirements, hood type, and fire-suppression compatibility.
- Schedule a pre-submittal meeting with your AHJ to confirm expectations.
2. Certification and Compliance Evidence
At factory acceptance or delivery, confirm the applicable evidence for the equipment and its integrated modules.
- Confirm visible data and listing plates; review applicable sanitation and food-contact hygiene standards (NSF/ANSI 4, 8, 51).
- Review applicable commercial cooking appliance, motor, and control safety evidence (UL 197 / CSA C22.2 No.109, UL 73 / UL 991 / IEC 60335-2-37).
- Review robotic system safety documentation (ISO 10218-1/2 / ANSI-RIA R15.06).
- For EU/UK installations, verify applicable CE or UKCA documentation and a valid technical file.
- Check that interlocks, sensors, and emergency stops appear in the risk-assessment summary.
- Ensure the manufacturer’s declaration identifies the integrated modules and system scope.
3. Installation and Field Readiness
During site setup, verify the installation against the manufacturer’s drawing and local requirements.
- Verify electrical supply matches nameplate voltage and load.
- Confirm the required dedicated disconnect and its location.
- Review hood capture and suppression coverage under applicable NFPA 96 / UL 300 requirements.
- Validate network drops, drains, and clearances.
- Ensure label visibility and enclosure airflow remain intact.
- Collect a commissioning report with firmware version, serial-number linkage, and functional safety test results.
4. Operational Safety and Maintenance
After commissioning, keep the system safely maintained and documented.
- Implement the applicable Lockout/Tagout procedure (OSHA 1910.147 / CSA Z460 / ISO 14118).
- Verify emergency-stop placement and reset behavior against applicable ISO 13850 requirements.
- Train staff on motion-zone access and restart protocols.
- Document periodic inspection of guards, sensors, and interlocks.
- Retain any field-evaluation label and service records.
- Confirm the required safety-control revalidation schedule with qualified professionals.
5. Digital HACCP and Recordkeeping
Maintain ongoing compliance and verifiable records according to your approved plan.
- Activate supported logging for temperature, time, and operator ID.
- Align monitoring points with applicable FDA Food Code and ISO 22000 requirements.
- Store calibration certificates with serial-number references.
- Maintain firmware change logs and version history.
- Set a retention policy appropriate to your jurisdiction; the source checklist proposes at least two years.
- Export logs before health or insurance audits.
Pro tip
Treat certification and safety evidence as living documents. Updates to firmware, components, or layout should trigger re-verification—not re-design.